In response to the appeal of the people of the left coast of the province of Sharqat, His Excellency the President of the Fund, Dr. Mustapha Al - Hiti, on the scale of the project on the investment plan of the Fund for 2018, after the project was included in the German emergency loan / phase II and the delay in the long-term loan. The initial cost of repair bridge is 6.500 billion dinars.
Please be aware that the bridge Sharqat concrete exposed to the destruction of the terrorist operations by blowing up a number of its spaces and columns by the organization calling the terrorist, a vital bridge linking the two sides of the judiciary as well as linking the province of Kirkuk and Erbil in Nineveh and Salahdin province and since the liberation of the left coast on 20/11/2017, the people suffers and face difficulties moving between the two courts of justice. In addition, His Excellency has directed to alleviate the suffering of the people during the transit through the establishment of a statement with good specifications dimensions (9 * 16) meters until the completion of the reconstruction of the bridge.
SHare: